Filtër

Kërkimet e mia të fundit
Filtro sipas:
Buxheti
deri në
deri në
deri në
Lloji
Aftёsitё
Gjuhët
    Shteti i punës
    2 punët e gjetura, me çmimin EUR
    4runner Storage cover 4 ditë left
    VERIFIKUAR

    Would like a cover designed for the storage cubby holes located in the rear of the 5th generation Toyota 4runner. Made from plastic with small thumb clips or button latch to remove.

    €134 (Avg Bid)
    €134 Oferta mesatare
    34 ofertat
    Asphalt Parking Lot 3 ditë left
    VERIFIKUAR

    Asphalt Project, will require the Villages Planning Commission's approval before a permit is issued. First, Hi Tech will need to Hire a Design Engineer to draw the plans for each parking lot with a). A flood zone component and b). Storm water detention component The Design engineer will need to complete 70% drawings to be submitted to the village's planning commission before they review and approve it. The Villages Ordinance for new parking lots include rules / requirements for Curb and Gutter and storm water detention When the plan is approved by the Planning Commission and the Village Board Hi Tech may be able to apply for Rezoning and the permit As the lots are over one half acre in size and we are in a flood zone we also need a MWRD Permit (Metropolitan Water and Recla...

    €3712 (Avg Bid)
    Lokale
    €3712 Oferta mesatare
    12 ofertat