can divide the network into three areas/zones, and assume that loads at all
buses within a given zone behave the same way.
Hint: Consider using normalized load profiles for various areas in New York,
from the New York Independent System Operator website (do some research
on your own to find the data on the website. Consider using “load data” and
“charts” as key words). You can alternatively use the load profiles from Project
Run 24-hour simulations and report the voltage magnitude and losses at all
buses, and line loading through all branches.
Deliverable.
• Plot a 3D plot depicting the voltage magnitude at each bus over time.
• Plot another 3D plot depicting the percent line loading through each branch
throughout the day.
• Plot a 2D plot showing the total losses throughout the day at every bus, and
calculate the total losses across the entire network